Energy, HVAC, fire & air quality testing · Sydney, Brisbane & Melbourne · 7 days, 24 hours

Blower door testing

Blower Door Testing for Homes and Commercial Buildings

Measure the airtightness of your building envelope with calibrated fan pressurisation testing — and find out where unwanted air leakage is costing you energy and comfort.

Measures
Whole-building envelope air leakage
Suitable for
Houses, apartments, commercial and industrial buildings
When
During construction, at completion or in existing buildings
You receive
A clear test report with results and practical recommendations

How it works

How blower door testing measures airtightness

A blower door test uses a calibrated fan, temporarily sealed into an external doorway, to create a controlled pressure difference between the inside and outside of the building. A digital manometer records the pressure difference and the airflow through the fan across a series of test points.

The more air the fan must move to hold a given pressure, the leakier the building envelope. From these measurements we calculate standard airtightness metrics, such as air changes per hour at 50 Pa (ACH50) and air permeability (m³/h·m² at 50 Pa), where applicable to your project.

While the building is under pressure, leakage pathways become easier to locate, so the test can show both how much air is leaking and where.

What’s included

  • Building envelope air leakage measurement
  • Identification of unwanted air infiltration and exfiltration
  • Testing for residential and commercial buildings
  • Testing during construction and after completion
  • Air permeability and air changes per hour results, where applicable
  • A test report with practical recommendations
  • Follow-up testing after remedial work

Benefits

Why test with a blower door?

Identifying air leakage helps reduce heating and cooling energy waste, improve indoor comfort and support your building performance goals.

Reduce energy waste

Find the leakage that makes heating and cooling systems work harder than they need to.

Improve indoor comfort

Address draughts, cold spots and uneven temperatures at the source.

Support performance targets

Measure results against the airtightness target set for your project.

Construction quality assurance

Check sealing quality while issues are still accessible and cost-effective to fix.

Our process

What happens on test day

Every project is different, but a typical blower door test follows four steps.

1

Confirm scope

We confirm the building, project stage, any airtightness target and the applicable test method.

2

Prepare the building

We provide a preparation checklist — windows and external doors closed, and some intentional openings temporarily sealed.

3

Test & investigate

We install the fan, take readings across a range of pressures and investigate key leakage locations.

4

Report & recommend

You receive the results, observations and practical recommendations, with retesting available after remedial work.

For builders, engineers & consultants

Technical detail

Testing is scoped to suit your project and, where specified, carried out with reference to AS/NZS ISO 9972 (fan pressurisation method). Requirements vary by building class, location and compliance pathway, so we recommend confirming the applicable target with your building surveyor or design team before testing.

  • Depressurisation and/or pressurisation testing, as scoped
  • Results reported as ACH50 (n50) and/or air permeability (q50), where applicable
  • Envelope area and internal volume calculated from project drawings
  • Multi-point tests across a range of pressure differences
  • Larger buildings may require multiple fans or zoned testing
  • Leakage locations documented with photographs and notes

Standards & compliance

Australian Standards we work to

Testing is carried out with reference to the following standards and codes, as applicable to your project. The required standard and pass criteria are confirmed with you, your building surveyor or your design team when we scope the work.

  • AS/NZS ISO 9972:2015Thermal performance of buildings — determination of air permeability by the fan pressurisation method. Method 1 is used for NCC verification.
  • NCC 2022 H6V3Verification of building envelope sealing for Class 1 homes: not more than 10 m³/h·m² at 50 Pa (additional ventilation requirements apply at 5 m³/h·m² or less).
  • NCC 2022 J1V4Building envelope sealing verification for Class 2–9 buildings, where nominated as the compliance pathway or project target.
  • ATTMA TSL2Air tightness testing methodology for larger and complex buildings, used where specified.
  • Passive House (PHI)Certified new buildings require n50 of no more than 0.6 air changes per hour at 50 Pa.

Fast, qualified quote

Get an accurate quote in under 2 minutes

Tell us your building type, timeframe and the testing you need. We’ll prioritise your enquiry and come back with a clear scope and price.

  • Testing to the relevant Australian Standards
  • Sydney, Brisbane & Melbourne
  • Available 7 days, 24 hours

FAQs

Frequently asked questions

Can’t find what you’re looking for? Get in touch and we’ll be happy to help.

For a typical house, testing usually takes a few hours including set-up and leak investigation. Larger or more complex buildings take longer. We’ll give you a time estimate when we confirm the scope.

Ideally twice: once the air barrier is complete but before internal linings are installed, when leaks are still accessible and easier to fix, and again at completion to confirm final performance.

We’ll send a checklist before the visit. Typically, external windows and doors are closed, internal doors are open, and some intentional openings — such as exhaust fans or flues — are set up according to the test method. Heating, cooling and fireplaces must be off.

No. The pressure differences used are modest and comparable to those created by a moderate wind. Loose items, ash in fireplaces and unsealed works may need to be secured beforehand.

It depends on the building class, the compliance pathway and any project-specific requirements. Your building surveyor or design team can confirm whether testing is required; we can then scope the test to suit.

We help locate the main leakage pathways and provide practical recommendations. Once sealing works are complete, a follow-up test can verify whether the target has been achieved.

Get started

Ready to Improve Your Building's Energy Performance?

Tell us what you need tested and when. We’ll prioritise your request and come back with a clear scope and price.

  • Testing to Australian StandardsClear reports your certifier and project team can rely on.
  • Sydney, Brisbane & MelbourneTechnicians across NSW, QLD and VIC.
  • Available 7 days, 24 hoursAfter-hours testing to suit occupied buildings.

Get a fast quote

Takes under a minute · No obligation

By submitting, you agree to our Privacy Policy.

Energy, HVAC, fire & air quality testing · 7 days, 24 hours

Request a Quote

hello@airxpresstesting.com.au
Sydney · Brisbane · Melbourne · 7 days, 24 hours